Word has it that the grounds crew was in on the weekend, apparently taking advantage of the mild weather. As you can see, we dug up the much-too-small forward tee on 13 and will be replacing it with a new deck that will be large enough for both sets of forward tee markers.
We have used this technique in the past where the ground is excavated down 8-12 inches and we haul (or push, in this case) all the accumulated branches, leaves, sod and old flowers. Then this material is covered over with the soil and a layer of screened loam.
No comments:
Post a Comment